Lemieux Construction
A SpeedWall facade panel being lifted at the 11 Brock worksite

Speedwall Prefabricated Façade Installation in Toronto

11 BrockBuilding Faster, Building Differently

42 Affordable Homes. One Ambitious Timeline.

The Challenge

42 Affordable Homes. One Ambitious Timeline.

To address the housing crisis, Toronto is turning to innovation. The 11 Brock project delivers 42 affordable homes across four storeys. To accelerate construction, Flynn Group of Companies deployed Speedwall, its prefabricated modular façade system.

The Speedwall Solution

Prefabrication Meets Performance

Based on unitized curtain wall technology, Speedwall modules are assembled, insulated, and glazed off-site. Delivered ready for installation, they connect through an integrated air- and watertight joint system. The result: fewer on-site operations and faster building enclosure.

Installer working at the upper level of a panel on site
Installation work at panel level

Our Contribution

Specialized
Installation

Contracted by Flynn, Lemieux Construction installed the prefabricated Speedwall façade panels. Precision work that supported the deployment of this innovative technology and helped meet a demanding construction schedule.

Request a quote

Project Video

From Design to Installation

Watch how Flynn designed, manufactured, and installed the Speedwall system at 11 Brock.

Planning a Commercial Façade Project?

Request a Quote

Lemieux Construction provides specialized installation crews for curtain walls, glass façades, and prefabricated façade panels.

Type of service

Saint-Bruno-de-Montarville
Greater Montreal and the South Shore